News Post
08/10/2024
Today we have one of pipe rehabilitation teams out undertaking descaling work before than installing a localised patch repair over the damaged pipe.
Good to see the latest addition to the fleet out working.
This is our second powerful 32t super sucker unit, and our...
Final day of this emergency flooding job in Wantage, with our tanker teams operating 24/7 to keep the system live moving 1’872’000 litres of waste minimising disruption.
Alongside this, our in-house Traffic Management division...



