Drain Technology’s tanker division today has been tasked to empty a storm system and associated boreholes, with an expected waste total of around 180t to allow flood investigation and infiltration level checks to commence.
Robotic Cutting Team Resolves Failed Patch Liner in Basement Drainage System
Our robotic cutting crew removed a failed patch liner, packer and all, from a basement system after issues caused by another contractor.




