At Drain Technology, we pride ourselves on delivering pipe rehabilitation services that are efficient, reliable, and completed with minimal disruption to our clients’ sites.
This week, one of our pipe rehabilitation teams has been fully engaged on-site, installing multiple liners across various locations to support the seamless operation of site drainage systems. The team’s work included the installation of a 25-metre liner within a 225mm pipe, followed by a 56-metre liner in a 150mm pipe the next day, showcasing our capability to handle both shorter, larger diameter and longer, smaller diameter lining requirements.
Our pipe rehabilitation crews use the latest lining methods and specialist equipment to ensure long-lasting results while reducing the need for disruptive excavation. These works are essential in extending the operational life of drainage infrastructure, reducing the likelihood of blockages and structural failures, and providing cost-effective solutions for clients who need reliable drainage networks.
As with every project, our team approached these installations with professionalism and efficiency, ensuring high standards of safety and workmanship throughout. Whether working in confined spaces or managing complex access requirements on site, our engineers and operatives are fully trained and certified to handle every aspect of pipe rehabilitation safely and competently.
This work is part of our broader commitment to providing comprehensive drainage and environmental services across the South, West, and Central regions, ensuring that our clients’ sites remain operational and compliant without unnecessary delays or disruption.
If you require a trusted partner for pipe rehabilitation projects, whether for planned preventative maintenance or emergency reactive works, please get in touch with our experienced team.