News Post

04/16/2026
Three lane road at night time with two vans and barriers and cones blocking the road. Road closed sign.

Night one of seven is underway in Bicester, Oxford, with TTM successfully implementing a full main road closure to enable a valued client to begin their major infrastructure scheme.

Four lane road in darkness being lit by street lamps. Traffic cones separate one lane from the rest. Road closure sign and traffic cones closing an exit on a roundabout. Highway maintenance van behind the cones. Road closure sign and traffic cones closing an exit on a roundabout. Highway maintenance van behind the cones.

The project involves redesigning an existing roundabout, widening lanes, and creating a new access point into a facility currently under construction. With multiple lane closures and a complex three-point road closure in place, the operation reflects months of detailed planning and coordination.

Four lane road at night, lit up by streetlights with two lanes separated by a line of cones. "Road Ahead Closed" sign leading up to a roundabout at night time, lit up by street lights. One lane closed with traffic cones and a highway maintenance vehicle. Four lane road at night, lit up by streetlights with two lanes separated by a line of cones. Closed road at night time  lit up by streetlights. Road closed sign in the centre with a traffic cone either side and barriers.

A significant volume of equipment has been mobilised on site, and the works have progressed smoothly so far, marking a strong start to the programme.

For all enquiries contact us below

Tel: 01865 965176

Email: [email protected]

Follow us: TTM Division – Traffic Management and Civils Drain Technology UK Ltd