Our rehabilitation team has been back on site today installing another high-performance liner for a valued client. This particular installation featured a 51-metre liner with a 150mm diameter, inverted using our dedicated liner cannon and cured using a controlled, recirculated hot water system.
These trenchless solutions not only reduce disruption but also ensure long-term performance across the network. The result? Another satisfied client, so much so, they’ve extended the scope by requesting an additional 50-plus metre line be added to the programme.
At Drain Technology, selecting the right method for the job is central to our approach. Whether it’s remote access, confined spaces, or complex rehabilitation requirements, our team delivers practical solutions with minimal surface disruption and maximum reliability.